Feature Upgrade · Generic · Created by
Knuffel
open
What functionality is missing? What is unsatisfying with the current situation?
At the moment every timeline event needs a fixed, absolute date. You can't date an event relative to another one, like "Event A happens 3 years after Event B".
That causes problems in several situations:
- The calendar or era system of my world isn't decided yet, or I don't know which year the "present" of my story is. I still have to enter specific years, which I'll have to change later.
- If one date changes, I have to update every related event by hand. That's tedious and easy to get wrong.
- When many storylines run at the same time, it's hard to keep track of how events depend on each other. Continuity errors and plot holes slip in easily, for example a character who is too young for an event or two events in the wrong order.
How does this feature request address the current situation?
Events could get a relative date instead of an absolute one. A relative date has a reference event, an offset (e.g. +3 years, −2 months, +10 days) and optionally whether it counts from the reference event's start or end.
Events can be chained (C depends on B, B depends on A). One event, or a "present day" setting, is the anchor with a real date, and all other dates are calculated from it. If the anchor or any event in the chain moves, everything that depends on it moves too.
This means:
- I can plan the structure and timing of my story first and settle the calendar later. Until an anchor is set, the timeline could show relative values like "Anchor + 12 years".
- Changing a date no longer means editing many events by hand.
- The connections between events are stored in the timeline itself, so it stays consistent.
Optional additions that would make it even more useful: warnings for circular references (A depends on B, B depends on A), warnings for impossible orders (e.g. a death before a birth), and approximate offsets ("about 3 years after").
What are other uses for this feature request?
- Character ages and lifespans: births, deaths and life events relative to other events, so ages always stay correct.
- Game masters and campaigns: planning events relative to the start of a campaign or session ("the invasion begins 2 months after the party arrives") without fixing an in-world date.
- Prehistory and myths: ancient events where only the order and rough gaps matter ("about 1000 years before the Founding").
- Reworking existing worlds: moving a whole era or story arc by changing just one event.
- Parallel storylines: keeping several plot threads in sync, for example in novels with several POV characters.
- Durations and consequences: wars, reigns or journeys that start or end relative to a triggering event.
- Experimenting: trying out different "present day" settings or timeline versions without rebuilding the whole timeline.
Current score
3/300 Votes · +1200 points